ESHQ Goals 2004

Organizational Unit/Site/Country    Goal    Action    Status
Corporate   ISO 14001 certification of all Degussa’s major production sites, EMAS validation in selected regions   Decentralized implementation by business units   ISO 14001 certification had been achieved for more than 95% of Group-wide production by year-end 2004
Aerosil & Silanes, Rheinfelden, Germany   1. Improve exhaust gas situation to increase availability of plants and reduce emissions   Erect a central thermal exhaust gas scrubbing unit   On cost grounds, it was decided to implement the following measures instead of erecting a central exhaust gas scrubbing unit:
a. Upgrade the existing incineration plant (by 2005)
b. Pressure condensation of exhaust gases (by December 2005)
c. Back-up scrubber for HMDS (by June 2005)
d. Combine exhaust air streams from VE scrubbers (by June 2005)
    2. Reduce energy-related carbon dioxide emissions   Extend supply of steam from the cogeneration plant for the northern section of the site   Achieved.The northern and southern sections of the site have been linked via steam and condensate pipelines. Start-up took place on schedule in early 2005.
Coatings & Colorants, Herne/Witten, Germany   1. Reduce consumption of natural gas by at least 200,000 m³ p.a. and raise output at the same time   Pre-heat with excess steam, utilize exhaust air, reduce ballast gas in plant, reduce heating requirements by cutting cooling water and brine consumption   The anticipated reduction in consumption of natural gas has been achieved.
    2. Reduce wastewater load by 25% in the polyester 1 plant   Introduce a new wastewater treatment process   Test run delayed; expected completion date: 2006
Coatings & Colorants, Marl, Germany   Reduce volume of wastewater by approx. 500 m³ p.a. and reduce wastewater load in synthetic resin production   Switch process from base catalysis to phase transfer catalysis   Changeover delayed; expected to take place by end 2005
C4 -Chemistry, Marl, Germany   Reduce water consumption and amount of wastewater in the raffinate I/II plant by 30%   Reduce wastewater from C4 scrubbers   Target not achieved. Concept was not realized due to technical problems.
Exclusive Synthesis & Catalysts, Wolfgang, Germany   Reduce HCl in flue gas by 30%   Connect to thermal afterburner and add flue gas scrubbing step   Target achieved. Connection implemented and scrubber came into operation in 2004; emissions measurements show action was effective.
Advanced Fillers & Pigments, Kalscheuren, Germany   Avoid heat and water losses in the gas black plant   Utilize exhaust heat from the plant by decoupling from district heating supply   Achieved.
Advanced Fillers & Pigments, Wesseling, Germany   Further reduction (10%) in off-spec products that cannot be recycled   Optimize production planning and process design   Target not achieved. Increased number of start-up procedures due to product changeovers increased off-spec products from 131 metric tons in 2003 to 150 metric tons in 2004.
Feed Additives, general   Optimize the use of amino acids in animal feeds   Carry out lifecycle assessments to compare feeds with and without additional amino acids and their ecological profile   Lifecycle analyses of the use of D, L methionine, L-lysine and l-threonine in poultry and pig farming successfully completed. -> See article in Corporate Citizenship Report, page 31
Food Ingredients, Trostberg, Germany   Reduce cooling water in the refrigeration plant by more than 10,000 m³ p.a.   Install a new control valve that is linked to the new computer system   Achieved.
High Performance Polymers, Marl, Germany   Reduce amount of waste in the laurolactam plant by approx. 1,000 metric tons   Reprocess and re-use resin residues   Achieved.
Methacrylates, Worms, Germany   1. Reduce groundwater extractions by 15% compared with 1999   Optimize the cooling process   Achieved.
    2. Reduce specific energy consumption in the production of methylmethacrylate   Alter process management for part of the process   Achieved.
Methacrylates, Weiterstadt, Germany   Save energy   Cut energy requirements by 20% through an optimization project (e.g., shorter polymerization times)   Partly achieved. Continuing in 2005.
Specialty Acrylics, Wolfgang, Germany   Reduce pressure on resources   Reduce steam and recooling water requirements by retrofitting stirrer system   Achieved.
Site Services and business units, Antwerp, Belgium   Reduce noise emissions   Identify sources of noise, studies and measuring programs, improvements within plants   Various plants have initiated action to reduce noise. Efficacy will be monitored following completion.
Site Services, Essen, Germany   Reduce fresh water consumption in boiler house (generation of steam)   Collect rainwater from nearby roofs for use in the boiler house   Achieved.
Site Services, Lülsdorf, Germany   Ongoing development of the Integrated Management System (IMS) for EHSQ   Introduce an IT-based document management system for electronic document generation, control and archiving   Rollout completed. Target fully achieved.
Site Services, Wesseling, Germany   Reduce primary energy requirements by 2% per metric ton of product   Draw up and check energy balance/utilize scope to optimize energy consumption   Ongoing. Target should be achieved by December 2005.
Site Services, Wolfgang Industrial Park, Germany   Save energy   Continuous monitoring of energy used to heat buildings managed by IPW GmbH; identify action to reduce consumption by 5%   Target not achieved in 2004. Start-up of a new, high-performance back pressure turbine is planned for 2005.